TRAM 015

From ACT Bus Fleetwiki
Revision as of 17:16, 22 August 2024 by Barry Drive (talk | contribs) (Delivered (tbc))
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Tram 015
Chassis CAF Urbos 100
Depot Mitchell
Status Not in service
Delivered 23 August 2024
Entered Service --
Build Date 2024
Capacity 66 seated, 207 total
Gallery Album --

<< prev | next >>

²

Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.

Notes

  • Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered.
  • It was transported from Santander, Spain aboard Höegh Trapper and arrived at Port Kembla on 10 August 2024.
  • It is fitted with on-board batteries, enabling it to operate wire-free for short distances.