TRAM 017

From ACT Bus Fleetwiki
Revision as of 17:04, 24 July 2024 by Barry Drive (talk | contribs)
Jump to navigation Jump to search
Tram 017
Chassis CAF Urbos 100
Depot Mitchell
Status Not in service
Delivered 25 July 2024
Entered Service --
Build Date 2024
Capacity 66 seated, 207 total
Gallery Album --

<< prev | next >>

²

Tram 017 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.

Notes

  • Tram 017 was transported from Santander, Spain aboard Höegh Trotter and arrived at Port Kembla on 22 July 2024.
  • Tram 017 is the first of five CAF Urbos 100 trams to be delivered for Stage 2A of the Canberra Light Rail.
  • It is fitted with on-board batteries, enabling it to operate wire-free for short distances.