* Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
* Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
* It is being transported from Santander, Spain aboard ''Höegh London'' and is due to arrive at Port Kembla on 30 June 2024.
<!-- * It is being transported from Santander, Spain aboard ''Höegh London'' and is due to arrive at Port Kembla on 30 June 2024. ## uncertain whether 015 or 016 was on board ''London'' ##
-->


[[Category:CAF Urbos 100]]
[[Category:CAF Urbos 100]]
[[Category:Expected Trams]]
[[Category:Expected Trams]]

Revision as of 18:49, 18 July 2024

Tram 015
Chassis CAF Urbos 100
Depot --
Status --
Delivered --
Entered Service --
Build Date 2024
Capacity 66 seated, 207 total
Gallery Album --

<< prev | next >>

²

Tram 015 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024.

Notes

  • Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
  • It is fitted with on-board batteries, enabling it to operate wire-free for short distances.