TRAM 015: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
(New)
 
mNo edit summary
Line 39: Line 39:


==Notes==
==Notes==
* Tram 015 will be the first of five new trams ordered for Stage 2B of the Canberra Light Rail line.
* Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
* It will be fitted with on-board batteries, enabling it to operate wire-free for short distances.
* It will be fitted with on-board batteries, enabling it to operate wire-free for short distances.


[[Category:CAF Urbos 100]]
[[Category:CAF Urbos 100]]
[[Category:Expected Trams]]
[[Category:Expected Trams]]

Revision as of 20:12, 21 October 2022

Tram 015
Chassis CAF Urbos 100
Depot --
Status Ordered
Delivered --
Entered Service --
Build Date --
Capacity 66 seated, 207 total
Gallery Album --

<< prev | next >>

²

Tram 015 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024.

Notes

  • Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
  • It will be fitted with on-board batteries, enabling it to operate wire-free for short distances.