TRAM 015: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) No edit summary |
Barry Drive (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
|- | |- | ||
| '''Status''' | | '''Status''' | ||
| | | -- | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
Line 40: | Line 40: | ||
* Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line. | * Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line. | ||
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances. | * It is fitted with on-board batteries, enabling it to operate wire-free for short distances. | ||
* It is being transported from Santander, Spain aboard ''Höegh London'' and is due to arrive at Port Kembla on 30 June 2024. | <!-- * It is being transported from Santander, Spain aboard ''Höegh London'' and is due to arrive at Port Kembla on 30 June 2024. ## uncertain whether 015 or 016 was on board ''London'' ## | ||
--> | |||
[[Category:CAF Urbos 100]] | [[Category:CAF Urbos 100]] | ||
[[Category:Expected Trams]] | [[Category:Expected Trams]] |
Revision as of 18:49, 18 July 2024
Tram 015 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | -- | |
Status | -- | |
Delivered | -- | |
Entered Service | -- | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | -- |
² ⁴
Tram 015 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024.
Notes
- Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.