TRAM 015: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (New) |
Barry Drive (talk | contribs) mNo edit summary |
||
Line 39: | Line 39: | ||
==Notes== | ==Notes== | ||
* Tram 015 will be the first of five new trams ordered for Stage | * Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line. | ||
* It will be fitted with on-board batteries, enabling it to operate wire-free for short distances. | * It will be fitted with on-board batteries, enabling it to operate wire-free for short distances. | ||
[[Category:CAF Urbos 100]] | [[Category:CAF Urbos 100]] | ||
[[Category:Expected Trams]] | [[Category:Expected Trams]] |
Revision as of 20:12, 21 October 2022
Tram 015 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | -- | |
Status | Ordered | |
Delivered | -- | |
Entered Service | -- | |
Build Date | -- | |
Capacity | 66 seated, 207 total | |
Gallery Album | -- |
² ⁴
Tram 015 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024.
Notes
- Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
- It will be fitted with on-board batteries, enabling it to operate wire-free for short distances.