BUS 676 (2): Difference between revisions
Jump to navigation
Jump to search
m (Text replacement - "gallery/ACTION-Buses-Current/Scania-K360UA-Optimus" to "gallery-current-action-buses/nggallery/scania-k360ua-optimus") |
Barry Drive (talk | contribs) (→All Over Advertising: new AOA) |
||
Line 76: | Line 76: | ||
:* also on Buses [[BUS 621 (2)|621]] [[BUS 672 (3)|672]] & [[BUS 680 (2)|680]] | :* also on Buses [[BUS 621 (2)|621]] [[BUS 672 (3)|672]] & [[BUS 680 (2)|680]] | ||
[[File:Photo.png|link=]] '''Brindabella Christian College''' – ''16 November 2021 to | [[File:Photo.png|link=]] '''Brindabella Christian College''' – ''16 November 2021 to 26 May 2023'' | ||
:* also on Buses [[BUS 621 (2)|621]] [[BUS 672 (3)|672]] & [[BUS 680 (2)|680]] | :* also on Buses [[BUS 621 (2)|621]] [[BUS 672 (3)|672]] & [[BUS 680 (2)|680]] | ||
[[File:NoPhoto.jpg|link=]] '''Brindabella Christian College''' – ''30 May 2023 to current'' | |||
==Media== | ==Media== |
Revision as of 18:40, 28 May 2023
Bus 676 | ||
---|---|---|
Chassis | Scania K360UA | |
Depot | Belconnen | |
Entered Service | 23 November 2018 | |
Removed from Service | -- | |
Desto Equipment | Hanover LED | |
VIN | YS2K6X20001907653 | |
Body | Volgren "Optimus" | |
Body Number | VQ1514 | |
Body Date | Aug 2018 | |
Seating | AB63FRW | |
Climate Control | ThermoKing ASR 140 | |
Bike Rack | Sportworks DL2 (black handle) | |
Fuel | Diesel | |
Gallery Album | Bus 676 |
See Also: | |
* BUS 676 (1) | – Renault PR100.2 |
Bus 676 is a Scania K360UA 6x2/2 (Euro VI) articulated bus based at Belconnen Depot. It is currently in an all over advertising wrap for Brindabella Christian College.
Notes
- Bus 676 was delivered to Tuggeranong Depot on 2 October 2018.
- Bus 676 was registered on 26 October 2018.
- On 16 August 2019, Bus 676 suffered a structural failure on Cohen St (outside Belconnen Depot) which caused the trailer section to detach from the front section. (See below for video of incident.)
- It resumed service on 19 September 2019.
- In May 2021, Bus 676 was damaged in a collision.
- It was repaired and resumed service on 2 August 2021.
All Over Advertising
Brindabella Christian College – 23 April 2021 to 15 November 2021
Brindabella Christian College – 16 November 2021 to 26 May 2023
Brindabella Christian College – 30 May 2023 to current