TRAM 017: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
(In transit)
mNo edit summary
 
(One intermediate revision by the same user not shown)
Line 8: Line 8:
|-
|-
| valign=top | '''Depot'''  
| valign=top | '''Depot'''  
<!-- | [[:Category:Mitchell Tram Depot|Mitchell]] -->
| [[:Category:Mitchell Tram Depot|Mitchell]]
| --
|-
|-
| '''Status'''
| '''Status'''
| In transit
| Not in service
|-
|-
| '''Delivered'''
| '''Delivered'''
| --
| 26 July 2024
|-
|-
| '''Entered Service'''
| '''Entered Service'''
Line 35: Line 34:
[[File:Bike.jpg|25px|link=]]⁴
[[File:Bike.jpg|25px|link=]]⁴


Tram 017 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram.
Tram 017 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.


==Notes==
==Notes==
* It will be fitted with on-board batteries, enabling it to operate wire-free for short distances.
* Tram 017 was transported from Santander, Spain aboard ''Höegh Trotter'' and arrived at Port Kembla on 22 July 2024.
* Tram 017 is being transported from Santander, Spain aboard ''Höegh Trotter'' and is due to arrive at Port Kembla on 20 July 2024.
* Tram 017 is the first of five CAF Urbos 100 trams to be delivered for Stage 2A of the Canberra Light Rail.
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances.


[[Category:CAF Urbos 100]]
[[Category:CAF Urbos 100]]
[[Category:Expected Trams]]
[[Category:Mitchell Tram Depot]]
<!-- [[Category:Canberra Metro Trams]] -->
[[Category:Delivered July 2024]]

Latest revision as of 15:58, 25 July 2024

Tram 017
Chassis CAF Urbos 100
Depot Mitchell
Status Not in service
Delivered 26 July 2024
Entered Service --
Build Date 2024
Capacity 66 seated, 207 total
Gallery Album --

<< prev | next >>

²

Tram 017 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.

Notes

  • Tram 017 was transported from Santander, Spain aboard Höegh Trotter and arrived at Port Kembla on 22 July 2024.
  • Tram 017 is the first of five CAF Urbos 100 trams to be delivered for Stage 2A of the Canberra Light Rail.
  • It is fitted with on-board batteries, enabling it to operate wire-free for short distances.