TRAM 015: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) m (Text replacement - "25px|link=↵" to "") |
Barry Drive (talk | contribs) (Delivered (tbc)) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | {| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | ||
! colspan="3" align=center | <!-- insert photo here [[File: | ! colspan="3" align=center | <!-- insert photo here [[File:T015.jpg]] --> | ||
|- | |- | ||
! colspan="3" align=center bgcolor=#CCCCFF| Tram 015 | ! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 015</big> | ||
|- | |- | ||
| valign=top | '''Chassis''' | | valign=top | '''Chassis''' | ||
Line 8: | Line 8: | ||
|- | |- | ||
| valign=top | '''Depot''' | | valign=top | '''Depot''' | ||
| [[:Category:Mitchell Tram Depot|Mitchell]] | |||
|- | |- | ||
| '''Status''' | | '''Status''' | ||
| | | Not in service | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
| | | 23 August 2024 | ||
|- | |- | ||
| '''Entered Service''' | | '''Entered Service''' | ||
Line 21: | Line 20: | ||
|- | |- | ||
| valign=top | '''Build Date''' | | valign=top | '''Build Date''' | ||
| | | 2024 | ||
|- | |- | ||
| valign=top | '''Capacity''' | | valign=top | '''Capacity''' | ||
Line 35: | Line 34: | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
Tram 015 | Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service. | ||
==Notes== | ==Notes== | ||
* Tram 015 | * Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered. | ||
* It | * It was transported from Santander, Spain aboard ''Höegh Trapper'' and arrived at Port Kembla on 10 August 2024. | ||
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances. | |||
[[Category:CAF Urbos 100]] | [[Category:CAF Urbos 100]] | ||
[[Category: | [[Category:Mitchell Tram Depot]] | ||
[[Category:Delivered August 2024]] |
Latest revision as of 17:16, 22 August 2024
Tram 015 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | Not in service | |
Delivered | 23 August 2024 | |
Entered Service | -- | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | -- |
² ⁴
Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.
Notes
- Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered.
- It was transported from Santander, Spain aboard Höegh Trapper and arrived at Port Kembla on 10 August 2024.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.