TRAM 003: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
en>Barry
m (Text replacement - "25px|link= [4] 25px|link= [2] 25px|link= <!-- 25px|link= -->" to "25px|link=² 25px|link= 25px|link= 25px|link=⁴ ")
 
(AOA removed)
 
(10 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
! colspan="3" align=center |[[File:T003.jpg]]
! colspan="3" align=center |[[File:T003.jpg|link=]]
|-
|-
! colspan="3" align=center bgcolor=#CCCCFF| Tram 003
! colspan="3" align=center bgcolor=#CCCCFF| Tram 003
Line 18: Line 18:
| valign=top | '''Entered Service'''
| valign=top | '''Entered Service'''
| 20 April 2019
| 20 April 2019
|-
<!--  |-
| valign-top | '''Serial Number'''
| valign-top | '''Serial Number'''
| --
| -- -->
|-
|-
| valign=top | '''Build Date'''
| valign=top | '''Build Date'''
Line 29: Line 29:
|-
|-
| valign=top | '''Gallery Album'''
| valign=top | '''Gallery Album'''
| [http://www.actbus.net/gallery/Canberra-Metro/Tram-003 Tram 003]
| [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-003 Tram 003]
|}
|}
[[TRAM 002|<< prev]] | [[TRAM 004|next >>]]
[[TRAM 002|<< prev]] | [[TRAM 004|next >>]]
Line 35: Line 35:
[[File:WC.jpg|25px|link=]]²
[[File:WC.jpg|25px|link=]]²
[[File:CC.jpg|25px|link=]]
[[File:CC.jpg|25px|link=]]
[[File:Wifi.jpg|25px|link=]]
[[File:Bike.jpg|25px|link=]]⁴
[[File:Bike.jpg|25px|link=]]⁴
 
<!-- [[File:AOA.png|link=:Category:Current AOA Trams]]-->


Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram.
Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram.
<!-- It is currently in an all over advertising wrap for '''"Built for CBR" (ACT Government)'''. -->


==Notes==
==Notes==
* It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Target arriving on 30 April 2018.
* It was transported from Santander, Spain to Port Kembla, NSW on board ''Höegh Target'' arriving on 30 April 2018.
* It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av.
* It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av.
* On Saturday 12 November 2022 at around 7:45am, Tram 003 collided with a car at the Hinder St intersection.
** [http://www.onsceneact.com.au/index.php/511-car-and-light-rail-vehicle-collide-in-gungahlin On Scene ACT]
==All Over Advertising==
* [[File:Photo.png|link=]] '''Canberra Institute of Technology''' – ''24 May 2021 to 13 November 2021''
* [[File:Photo.png|link=]]'''"Built for CBR" (ACT Government)''' – ''4 May 2024 to June 2024''


[[Category:Canberra Metro Trams]]
[[Category:Canberra Metro Trams]]
Line 49: Line 56:
[[Category:Mitchell Tram Depot]]  
[[Category:Mitchell Tram Depot]]  
[[Category:Delivered May 2018]]
[[Category:Delivered May 2018]]
[[Category:Former AOA Trams]]

Latest revision as of 02:59, 3 July 2024

Tram 003
Chassis CAF Urbos 100
Depot Mitchell
Status In service
Delivered 4 May 2018
Entered Service 20 April 2019
Build Date Feb 2018
Capacity 66 seated, 207 total
Gallery Album Tram 003

<< prev | next >>

²

Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.

Notes

  • It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Target arriving on 30 April 2018.
  • It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av.
  • On Saturday 12 November 2022 at around 7:45am, Tram 003 collided with a car at the Hinder St intersection.

All Over Advertising

  • Canberra Institute of Technology24 May 2021 to 13 November 2021
  • "Built for CBR" (ACT Government)4 May 2024 to June 2024