TRAM 015: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
m (Text replacement - "25px|link=↵" to "")
No edit summary
 
Line 12: Line 12:
|-
|-
| '''Status'''
| '''Status'''
| Ordered
| In transit
|-
|-
| '''Delivered'''
| '''Delivered'''
Line 21: Line 21:
|-
|-
| valign=top | '''Build Date'''
| valign=top | '''Build Date'''
| --
| 2024
|-
|-
| valign=top | '''Capacity'''
| valign=top | '''Capacity'''
Line 39: Line 39:
==Notes==
==Notes==
* Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
* Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
* It will be fitted with on-board batteries, enabling it to operate wire-free for short distances.
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
* It is being transported from Santander, Spain aboard ''Höegh London'' and is due to arrive at Port Kembla on 30 June 2024.


[[Category:CAF Urbos 100]]
[[Category:CAF Urbos 100]]
[[Category:Expected Trams]]
[[Category:Expected Trams]]

Latest revision as of 19:27, 30 May 2024

Tram 015
Chassis CAF Urbos 100
Depot --
Status In transit
Delivered --
Entered Service --
Build Date 2024
Capacity 66 seated, 207 total
Gallery Album --

<< prev | next >>

²

Tram 015 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024.

Notes

  • Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
  • It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
  • It is being transported from Santander, Spain aboard Höegh London and is due to arrive at Port Kembla on 30 June 2024.